Business

Sustainable Future

TS TECH is committed to delivering world-class water and wastewater treatment systems.

Wastewater Treatment & Reuse

From wastewater to value,
technology that achieves both efficiency
and environmental performance

We possess specialized expertise in the design and fabrication of customized systems, providing optimized process design and equipment tailored to the characteristics of wastewater from various industries to meet effluent discharge standards.

Classification of Major Treatment Facilities by Process

  • Physical Treatment Facilities
    Screens, Gravity/Pressure Filter Tanks
  • Chemical Treatment Facilities
    Neutralization/Reaction/
    Flocculation
  • Biological Treatment Facilities
    Aeration, Sedimentation, MBR Process
  • Advanced Treatment Facilities
    Ammonia Treatment, Ozone
    Oxidation, Digestion
  • Sludge Reduction Facilities
    Filter Press, Decanter,
    Belt Press
Physicochemical Treatment

Based on extensive experience in treating various industrial wastewaters, we conduct precise contaminant analysis and perform pilot testing to determine the most efficient process configuration. Through this approach, we deliver optimized design solutions and cost-effective construction services.

  • Drum screen
  • Reaction Tank
  • CLARIFIER
  • D.A.F System
Chemical Treatment

By integrating oxidation–reduction, coagulation–sedimentation, adsorption, and ion exchange processes into a customized all-in-one process, we provide a chemical treatment method that facilitates both pretreatment and downstream processes while maintaining low operating costs.

  • Hybrid Oxidation–Reduction–Adsorption Process
  • Ion Exchange Process
  • Coagulation–Sedimentation Process
  • Coagulation–Neutralization Process
Biological Treatment

TS-MBR(Membrane Bio-Reactor) is a process that combines biological treatment with membrane separation. The mixed liquor is filtered through membrane pores of 0.1–0.4 μm, enabling the production of high-quality treated water. In addition, the process can maintain a high MLSS concentration, making it suitable for handling high organic shock loads.

Advanced Treatment

TS-MBR(Membrane Bio-Reactor) is a process that combines biological treatment with membrane separation. The mixed liquor is filtered through membrane pores of 0.1–0.4 μm, enabling the production of high-quality treated water. In addition, the process can maintain a high MLSS concentration, making it suitable for handling high organic shock loads.

Ozone-Based Advanced Oxidation Process (AOP) System
Advanced Membrane Filtration Treatment System
Chlorine Injection Advanced Treatment System
Sludge Reduction Facilities

Our sludge reduction facilities consist of thickening, dewatering, anaerobic digestion, high-temperature heat treatment, ultrasonic and ozone treatment, dewatering and drying processes.
Based on extensive wastewater treatment experience, we provide high- efficiency sludge treatment solutions.

Wastewater Treatment Track Record

  • Client
  • Project
  • Year
  • Location
  • Remarks
Client
Kemco
Project
Trace substance (e.g., Ca) removal equipment
Year
2025
Location
Onsan, Korea
Remarks
Client
Kemco
Project
TOC removal facilities
Year
2025
Location
Onsan, Korea
Remarks
Client
Techcross Water & Energy
Project
Namyangju Hwado public sewage treatment facility private investment project
Year
2025
Location
Namyangju, Korea
Remarks
Client
Techcross Water & Energy
Project
Expansion of WWT plant and delivery and installation of DI water treatment equipment
Year
2024
Location
Changwon, Korea
Remarks
75㎥/h * 3Sets
Client
Samyang Packaging
Project
Construction of a new WWT plant at Gwanghyewon Plant Unit 6
Year
2023
Location
Gwanghyewon, Korea
Remarks
1,600㎥/d
Client
JN Tech
Project
Construction of landfill leachate facilities
Year
2021
Location
Dangjin, Korea
Remarks
350㎥/d
Client
CJ Malaysia
Project
WWTP Process Normalization
Year
2021
Location
Malaysia
Remarks
13,200㎥/d
Client
Lotte
Project
Construction of WWT systems
Year
2020
Location
Parkistan
Remarks
2000㎥/d
Client
CJ Malaysia
Project
WWTP AN Advanced Treatment
Year
2020
Location
Malaysia
Remarks
13,200㎥/d
Client
Korea Eundan
Project
WWT facility expansion project
Year
2020
Location
Ansan, Korea
Remarks
700㎥/d
1 2 3